Start with a clearly defined scope.
Flat sawing requests often involve utility routes, removal perimeters, floor alterations or pavement sections. Send the marked plan rather than only a total square footage: the number of starts, corners and separate work areas can matter as much as the total length.
Typical project requests
- Floor and pavement cuts
- Trench boundaries
- Panel isolation before breakout
- Sawing for renovation work
What to send for an estimate
The more accurately the request describes the site, the more useful the scope review can be. Mark uncertain dimensions or conditions as unknown rather than treating them as confirmed.
- Linear feet of cuts
- Estimated thickness
- Corners and separate work areas
- Water, power and access information
A planning detail that matters
Confirm whether a slab is on the ground or suspended. A suspended slab is not treated like ordinary pavement; the support, loading and removal sequence must be reviewed for that structure.
Make the handoff clear.
Tell us who controls the property, which adjacent areas remain in use and who handles the work before and after this scope. Removal, disposal, replacement, permits, engineering and specialty services should be identified separately in the written proposal.
Before you request pricing
Can I send photos before a site visit?
Yes. Email wide site views, close material views and the access route. Include the project address and any plans. Photos help with initial review but do not replace any site investigation needed for a final proposal.
Can this be combined with other concrete work?
Send the complete desired result. Related cutting, removal, hauling, sitework and new concrete can be reviewed together, with each accepted part of the scope stated in the proposal.
Does 24/7 mean an immediate crew arrival?
No. Phone and email inquiries are open 24/7. Acceptance, arrival time and work hours depend on project review, travel, access, required approvals and crew scheduling.
