Project planning guide

Concrete Work in Occupied Buildings

Organize access, protection and coordination before production.

Map the occupied and construction areas

Show tenant spaces, public routes, emergency access and the boundaries of the work. Identify who authorizes closures and who communicates changes to occupants.

Review equipment and material movement

Doorways, elevators, stairs and floor loading affect access. The inside route and the outside loading area should be considered together, including protection of finished surfaces.

Plan controls for the actual task

Dust, water, slurry, noise and ventilation need project-specific controls. OSHA publishes construction silica requirements; controls and any respiratory protection must be selected for the actual task and exposure conditions.

Confirm the reopening criteria

Define what must be complete before an area is released: cleanup, protection, inspection, curing or follow-on work. A 24/7 contact number does not waive the building rules or mean every task can run at any hour.

This guide supports initial project planning. It is not an engineering design, a permit determination, an exposure-control plan or a fixed-price proposal. Site conditions and applicable requirements must be reviewed before work is accepted.

Turn this checklist into a project request

Big concrete plans? Start here.

Send the location, scope and photos. Let's talk through the next step.

Call Email Get a quote

Find a service or city

Enter at least 2 characters.