Start with a clearly defined scope.
Footings and piers are reviewed from the structural details and site conditions provided. Share the plan, sections, reinforcement and any bearing requirements so excavation, forms, concrete and inspections can be coordinated as part of the quote.
Typical project requests
- Continuous footing requests
- Isolated footings and piers
- Equipment and structure bases
- Footing replacement scope review
What to send for an estimate
The more accurately the request describes the site, the more useful the scope review can be. Mark uncertain dimensions or conditions as unknown rather than treating them as confirmed.
- Footing schedule and dimensions
- Excavation and bearing information
- Reinforcement and anchor details
- Inspection requirements
A planning detail that matters
The specified bearing surface must be understood before placement. Unknown soils or water in an excavation should be resolved through the project team rather than covered by an assumed footing allowance.
Make the handoff clear.
Tell us who controls the property, which adjacent areas remain in use and who handles the work before and after this scope. Removal, disposal, replacement, permits, engineering and specialty services should be identified separately in the written proposal.
Before you request pricing
Can I send photos before a site visit?
Yes. Email wide site views, close material views and the access route. Include the project address and any plans. Photos help with initial review but do not replace any site investigation needed for a final proposal.
Can this be combined with other concrete work?
Send the complete desired result. Related cutting, removal, hauling, sitework and new concrete can be reviewed together, with each accepted part of the scope stated in the proposal.
Does 24/7 mean an immediate crew arrival?
No. Phone and email inquiries are open 24/7. Acceptance, arrival time and work hours depend on project review, travel, access, required approvals and crew scheduling.
