Start with a clearly defined scope.
We review concrete masonry unit work for foundations, wall sections, infills, openings and repair scopes. Include the wall dimensions, block type and structural details, especially where reinforcing, grout or lintels form part of the design.
Typical project requests
- Concrete block walls
- Masonry infills and alterations
- Foundation block work
- Block repair and replacement requests
What to send for an estimate
The more accurately the request describes the site, the more useful the scope review can be. Mark uncertain dimensions or conditions as unknown rather than treating them as confirmed.
- Wall length, height and thickness
- Block and finish requirements
- Reinforcement, grout and lintel details
- Access and temporary support requirements
A planning detail that matters
An existing block wall may be load-bearing even when the finish looks simple. Cutting, rebuilding or enlarging an opening requires the support conditions and design responsibilities to be clear.
Make the handoff clear.
Tell us who controls the property, which adjacent areas remain in use and who handles the work before and after this scope. Removal, disposal, replacement, permits, engineering and specialty services should be identified separately in the written proposal.
Before you request pricing
Can I send photos before a site visit?
Yes. Email wide site views, close material views and the access route. Include the project address and any plans. Photos help with initial review but do not replace any site investigation needed for a final proposal.
Can this be combined with other concrete work?
Send the complete desired result. Related cutting, removal, hauling, sitework and new concrete can be reviewed together, with each accepted part of the scope stated in the proposal.
Does 24/7 mean an immediate crew arrival?
No. Phone and email inquiries are open 24/7. Acceptance, arrival time and work hours depend on project review, travel, access, required approvals and crew scheduling.
